EasyManua.ls Logo

Fujitsu PRIMERGY CX2550 M1 - Troubleshooting and Tips; Power-On Indicator Issues; Server Node Shutdown Issues

Fujitsu PRIMERGY CX2550 M1
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CX2550 M1 Upgrade and Maintenance Manual 51
Basic hardware procedures
4.11 Controls and indicators on the server node
V CAUTION!
Follow the safety instructions in chapter "Important information" on
page 27.
Ê If applicable, connect all external cables to the server node.
Figure 14: Controls and indicators of the server node
I The server nodes are controlled via related operating panel areas on the
front side of the CX400 M1 server enclosure. See "FUJITSU Server
PRIMERGY CX400 M1 Server Enclosure Operating Manual".
4.12 Concluding software tasks
Ê Perform the following software tasks to put the server back in operation:
"Verifying the system time settings" on page 75
"Viewing and clearing the System Event Log (SEL)" on page 76
"Updating the NIC configuration file in a Linux environment" on page 77
"Performing a RAID array rebuild" on page 80
"Looking up changed MAC / WWN addresses" on page 80
1 Reset button (RST) 3 ID indicator
2 Global error LED 4 CSS indicator

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M1

Related product manuals