6.4 Riser card
V CAUTION!
Follow the safety instructions in chapter "Important information" on
page 27.
6.4.1 Replacing the riser card
6.4.1.1 Preliminary steps
Perform the following procedures:
Ê Locate the desired server with the ID button.
Ê "Shutting down the server node" on page 39
Ê If applicable, remove all external cables from the server node.
Ê "Removing the server node from the server enclosure" on page 40
Ê "Removing expansion cards" on page 110 (if applicable)
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: – Phillips PH2 / (+) No. 2 screw driver
– Phillips PH2 / (+) No. 2 screw driver)