EasyManua.ls Logo

Fujitsu PRIMERGY CX2550 M1 - Concluding Steps

Fujitsu PRIMERGY CX2550 M1
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CX2550 M1 Upgrade and Maintenance Manual 161
System board and components
Figure 61: SATA DOM spacer
Ê The SATA DOM spacer remains on the system board (1).
9.2.2.3 Concluding steps
Perform the following procedures:
Ê "Installing the server node in the server enclosure" on page 50
Ê If applicable, reconnect all external cables.
Ê "Controls and indicators on the server node" on page 51
Ê "Enabling SVOM boot watchdog functionality" on page 72

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M1

Related product manuals