EasyManuals Logo

Fujitsu PRIMERGY CX2550 M1 Upgrade And Maintenance Manual

Fujitsu PRIMERGY CX2550 M1
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #202 background imageLoading...
Page #202 background image
202 Upgrade and Maintenance Manual CX2550 M1
Liquid cooling
10.2.2 Preparing the memory modules
10.2.2.1 Preliminary steps
Ê "Disabling SVOM boot watchdog functionality" on page 54
Ê "Shutting down the server node" on page 39
Ê Disconnect the tubes from the tube system of the rack as described in the
"RackCDU
TM
Service Manual"".
Ê "Removing the server node from the server enclosure" on page 40
Ê "Removing the liquid cooling kit" on page 189
Ê "Removing memory modules" on page 124
10.2.2.2 Preparing a memory module
Figure 101: Prepared memory module
Ê Stick the cooling pad(s) on one or two sides of the memory modules, see
"Adhesive rules for the memory cooling pads" on page 200.
10.2.2.3 Concluding steps
I Before powering on the server node connect the tubes to the tube
system of the rack as described in the "RackCDU
TM
Service Manual".
Field Replaceable Unit
(FRU)
Hardware: 15 minutes
Software: 5 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY CX2550 M1 and is the answer not in the manual?

Fujitsu PRIMERGY CX2550 M1 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY CX2550 M1
CategoryServer
LanguageEnglish

Related product manuals