EasyManuals Logo

Fujitsu PRIMERGY CX2550 M1 Upgrade And Maintenance Manual

Fujitsu PRIMERGY CX2550 M1
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #189 background imageLoading...
Page #189 background image
CX2550 M1 Upgrade and Maintenance Manual 189
Liquid cooling
10.1.2 Replacing the liquid cooling kit
10.1.2.1 Preliminary steps
Ê "Disabling SVOM boot watchdog functionality" on page 54
Ê "Shutting down the server node" on page 39
Ê Disconnect the tubes from the tube system of the rack as described in the
"RackCDU
TM
Service Manual".
Ê "Removing the server node from the server enclosure" on page 40
10.1.2.2 Removing the liquid cooling kit
Figure 80: Removing the riser module
Ê Remove both riser modules (1, 2) as described in chapter "Removing the
riser module" on page 41.
I The connection of the flexible tubes to the liquid cooling system of the
rack you may find in the corresponding manual of the rack.
Field Replaceable Unit
(FRU)
Hardware: 15 minutes
Software: 5 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY CX2550 M1 and is the answer not in the manual?

Fujitsu PRIMERGY CX2550 M1 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY CX2550 M1
CategoryServer
LanguageEnglish

Related product manuals