198 Upgrade and Maintenance Manual CX2550 M1
Liquid cooling
Figure 95: Power cable routing
Ê Run the power cable of pump as shown.
Figure 96: Installing the second riser module
Ê Install the second riser module (1) as described in chapter "Installing the
riser module" on page 43.
10.1.2.4 Concluding steps
I Before powering on the server node connect the tubes to the tube
s
ystem of the rack as described in the "RackCDU
TM
Service Manual".
Ê "Installing the server node in the server enclosure" on page 50
I If the Global LED is flashing with error message "CPU has been
c
hanged" on display after the system is powered on, please follow the
procedure below.

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY CX2550 M1 and is the answer not in the manual?

Fujitsu PRIMERGY CX2550 M1 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY CX2550 M1
CategoryServer
LanguageEnglish

Related product manuals