Figure 95: Power cable routing
Ê Run the power cable of pump as shown.
Figure 96: Installing the second riser module
Ê Install the second riser module (1) as described in chapter "Installing the
riser module" on page 43.
10.1.2.4 Concluding steps
I Before powering on the server node connect the tubes to the tube
s
ystem of the rack as described in the "RackCDU
TM
Service Manual".
Ê "Installing the server node in the server enclosure" on page 50
I If the Global LED is flashing with error message "CPU has been
c
hanged" on display after the system is powered on, please follow the
procedure below.