EasyManua.ls Logo

Fujitsu PRIMERGY CX2550 M1 - Starting Up and Operation; Controls and Indicators

Fujitsu PRIMERGY CX2550 M1
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CX2550 M1 Upgrade and Maintenance Manual 39
4 Basic hardware procedures
4.1 Shutting down the server node
Safety notes
V CAUTION!
For further safety information, please refer to chapter "Important
information" on page 27.
I This step is only required when upgrading or replacing non-hot plug
components.
Ê Inform the system administrator that the server node will be shut down and
put offline.
Ê Terminate all applications.
Ê Press the On/Off button either on the rear or on the corresponding front
panel to shut down the server node.
I If the system is running an ACPI-compliant operating system,
pressing the On / Off button will perform a graceful shutdown.

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M1

Related product manuals