See 3.6 ( p.28)
Installing the Instrument
Initial Instrument Preparations
See 3.2 ( p.24)
See 3.3 ( p.26)
See 3.7 ( p.28)
See 3.11 ( p.36)
See "Instrument Installation" (p. 5)
Pre-Operation Inspection
Verifying Correct Wiring
Always perform these checks before connect-
ing, and when turning the power on.
Always execute zero adjustment before con-
necting to measurement objects.
See 3.10 ( p.34)
Connecting to the Lines to be Measured
See 3.9 ( p.30)
Setting the wiring mode
See 3.8 ( p.29)
Turning Power On
See 3.4 ( p.27)
Back side
Apply the appropriate adhesive labels near the
input jacks and around the voltage and current
sensor measurement cables. Then bundle the
voltage cables together with the spiral tubes.
Connecting the Voltage Measurement
Cables
Connecting the Current Sensors
Connecting the Power Cord
For best precision, allow at least 30 minutes
warm-up before executing zero adjustment and
measuring.