Figure 5-27 Installing a server blade on the shelf
5. (Skip this step when the connection kit L/P is not installed.)
Align the connector of the connection board of the connection kit L/P with
the male connector on the main board of the server blade, and then push
in the connection board straight downward by pushing the portion
indicated Push and opposite side at the same time.
Figure 5-28 Inserting the connection kit L/P
6. Put in the connection bracket, and then tighten a thumbscrew of the
connection bracket.
5-26
Replacing parts
Hitachi Compute Blade 500 Series System Service Manual