Iris Diagnostics, a Division of Iris International, Inc.
iQ
®
200 Sprint™ (2G) Automated Urine Microscopy Analyzer Service Manual 300-4949 Rev A 01/2005 9-5
9. Preventive Maintenance
Fluidic system components replacement
Peristaltic pump cassettes replacement
1. Remove and replace the cassette on the Cannula Pump (PN#700-
3823). Pull the tube ends to release the cassette tubing.
2. Remove and replace the cassette on the Evacuation Pump
(PN#700-3822). Unscrew the connectors to release the cassette
tubing.
3. Clamp the tube between the Lamina Bottle and the Lamina Pump
(green connector line) with a hemostat.