Iris Diagnostics, a Division of Iris International, Inc.
iQ
®
200 Sprint™ (2G) Automated Urine Microscopy Analyzer Service Manual 300-4949 Rev A 01/2005 9-7
9. Preventive Maintenance
Tubing replacement
1. Replace the Tubing fitting assembly (PN#700-3855) between the
EBV N.O. Port and the Flow Cell drain.
2. Replace the Tubing fitting assembly (PN#700-3857) between the
EBV Common Port and the line to the Evacuation Pump input.