Iris Diagnostics, a Division of Iris International, Inc.
iQ
®
200 Sprint™ (2G) Automated Urine Microscopy Analyzer Service Manual 300-4949 Rev A 01/2005 9-10
9. Preventive Maintenance
b. Insert the replacement tube from the top of the fluid
detector and connect to the flow cell.
c. Install the new green Tiny-Tight fitting; follow procedure P-
09-0046 “Instructions for Mounting Lite Touch Tiny Tight
Fittings onto Tubing” enclosed with the fitting.
d. Connect the green fitting to the PBV valve COM Port.
7. Replace the Tubing Assembly (PN#700-3806) from the Waste
Well Yellow connector to the Evacuation Pump.