Iris Diagnostics, a Division of Iris International, Inc.
iQ
®
200 Sprint™ (2G) Automated Urine Microscopy Analyzer Service Manual 300-4949 Rev A 01/2005 2-19
2. Installation Procedures
NOTE: Smooth rack transfer between stations and samplers is critical for
proper operation.
9. Turn “ON” the power switch located on the back of the Load Station.