Location Scenario
1 RAID flash power module on the chassis 2.5'' chassis installed with a standard or performance
heat sink
2 RAID flash power module on the air baffle 2.5'' or 3.5'' chassis installed with a standard heat sink
3 RAID flash power module on slot 3
• 3.5'' chassis installed with a performance heat sink
• 2.5'' chassis installed with liquid assisted cooling
module
An extension cable is provided for each RAID flash power module for connection. Connect the flash power
module cable to the flash power module connector on the corresponding RAID adapter as shown.
Figure 125. Power cable routing for flash power module
• Connect the RAID flash power module to the extension cable.
•
Connect the extension cable to the SFF/CFF RAID/HBA adapter.
Remove the RAID flash power module on the chassis
Use this information to remove the RAID flash power module on the chassis.
About this task
Attention:
• Read
“Installation Guidelines” on page 51 and “Safety inspection checklist” on page 52 to ensure that you
work safely.
• Power off the server and peripheral devices and disconnect the power cords and all external cables. See
“Power off the server” on page 68.
• Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-
sensitive components in their static-protective packages until installation, and handling these devices with
an electrostatic-discharge wrist strap or other grounding systems.
Procedure
Step 1. Remove the top cover. See
“Remove the top cover” on page 243.
Step 2. Disconnect the cable of the RAID flash power module.
190
ThinkSystem SR630 V3 User Guide