40
Overall Flow of Operation Section 4-1
4-1 Overall Flow of Operation
Refer to the following steps when using the NV-Designer for the first time.
*1 For details, refer to SECTION 5 Creating and Saving Projects (Including
Screen Data).
*2 For details, refer to SECTION 3 NV-Designer Outline and Configuration.
1
2
3
4
5
6
7
8
9
10
↓
↓
↓
↓
↓
↓
↓
↓
↓
Start the NV-Designer. *
1
Select the Start Menu. *
1
Opening a Base Screen
Set the NV-Configuration as required
(language settings, etc). *
2
Select the PT model and PLC model. *
1
Set system memory. *
1
Place a character string above the screen.
Drag and drop parts from a parts library
such as the Standard Parts Library.
Save the final project.
Transfer the final project to the PT.