Verify the System Configuration PROM
120 SPARC T5-8 Server Service Manual • November 2015
Related Information
■
“Remove the System Configuration PROM” on page 118
■
“Verify the System Configuration PROM” on page 120
Verify the System Configuration PROM
1.
Ensure that you have completed the following:
■
Applied power to the server.
See “Connect the Power Cords” on page 191.
■
Started the system.
See “Power On the Server (Oracle ILOM)” on page 192.
2.
Verify that the banner display includes an Ethernet address and a host ID value.
The Ethernet address and host ID values are read from the System Configuration PROM. Their
presence in the banner verifies that the service processor and the host can read the System
Configuration PROM.
. . .
SPARC T5-8, No Keyboard
.
OpenBoot X.XX, 16256 MB memory available, Serial
#87304604.Ethernet address *:**:**:**:**:**, Host ID: ********
. . .
3.
Log in to Oracle ILOM.
See “Log In to Oracle ILOM (Service)” on page 28.
4.
Start the faultmgmt shell.
-> start SP/faultmgmt/shell
Are you sure you want to start the faultmgmt shell (y/n)? y
faultmgmtsp>
5.
Use the fmadm faulty command to determine if the server is operating normally.
■
If a fault was detected, see “Diagnostics Process” on page 25.
■
If no fault was detected, the System Configuration PROM was installed successfully.
6.
For additional verification, run specific commands to display data stored in the
System Configuration PROM.
■
Use the Oracle ILOM show command to display the MAC address: