EasyManuals Logo

Oracle SPARC T5-8 User Manual

Default Icon
206 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #96 background imageLoading...
Page #96 background image
Install the Main Module
96 SPARC T5-8 Server Service Manual • November 2015
4.
Press the levers back together toward the center of the module, and then press
the levers firmly against the module to fully seat the module back into the server.
The levers should click into place when the module is fully seated in the server.
5.
Determine your next step:
a.
If you replaced an internal component, return to the procedure for that
component.
“Verify the Battery” on page 126
“Verify the Front I/O Assembly” on page 131
“Verify the Service Processor Card” on page 114.
“Verify the Storage Backplane” on page 107
“Verify the System Configuration PROM” on page 120
b.
If you replaced the entire main module, see “Verify the Main
Module” on page 97.

Table of Contents

Other manuals for Oracle SPARC T5-8

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle SPARC T5-8 and is the answer not in the manual?

Oracle SPARC T5-8 Specifications

General IconGeneral
BrandOracle
ModelSPARC T5-8
CategoryServer
LanguageEnglish

Related product manuals