EasyManua.ls Logo

Pitney Bowes Epic v3.1 - Page 167

Pitney Bowes Epic v3.1
336 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. With the pack control ramp set for the job material you are running, adjust the deck to the right, so
the red hopper belts are 1/8" (3 mm) away from the trail edge of the booklet.
Red Hopper Belts 1/8" (3 mm) Away from Ramp
5. Tighten the lockdown knobs under the bulk loader hopper deck.
6. Adjust the bulk loader hopper side guides. (Refer to the Adjusting Bulk Loader Hopper Side
Guides topic for details.)
Operator Adjustments
Pitney Bowes Epic v3.1 (ZVE0) Operator Guide May, 2018 Page 160 of 328

Table of Contents