Loading the Insert Feeders
1. Place one piece of material on the feeder belts.
Initial Loading
2. Shingle about a 1-inch (25 mm) stack of material and place it on top of the single piece.
3. Continue this until the stack is just about even with the top of the pack control ramp and then stack
to desired height.
Stack the Feeder - do not shingle beyond the point noted in this image
Running the System
Pitney Bowes Epic v3.1 (ZVE0) Operator Guide May, 2018 Page 199 of 328