EasyManua.ls Logo

Pitney Bowes Epic v3.1 - Network and Power Requirements

Pitney Bowes Epic v3.1
336 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Network and Power Requirements
The following network and power requirements apply to the Epic inserting system.
Network Requirements
l Data concentrator ethernet hub (min. 4-port)
l CAT5 cable from each DC and RTP PC to data concentrator hub
l CAT5 cable from data concentrator hub to data concentrator (modified PIDA server provided)
l Internet connect to data concentrator (LAN)
Power Requirements
l Domestic power (Canada, US, and Mexico)
l 3 Phase, 208VAC, 60Hz, 50 amp 4-wire connection (L1, L2, L3, Earth)
l Power plug for 3-wire plus earth domestic connection supplied
l Power plug supplied - NEMA 15-50P (Hubbell 8451C or equivalent)
l Power receptacle required: NEMA 15-50R receptacle (Hubbell 8450A or equivalent)
l Export 3 phase, 230VAC or 240VAC phase to neutral (400 VAC or 415 VAC phase to phase),
50Hz, 50 amps per phase, (L1, L2, L3, N, Earth)
l Power plug for 5-wire export connection
l Power plug for 5 wire connection is not provided. A suitable power connector rated at 240/415V,
50A minimum and inlet wiring that conforms to local wiring standards must be chosen by the
customer. (Connections are made by the customer to terminals inside the MPS power inlet
assembly. Wiring diagram shown on inside of removable front cover of the inlet assembly.)
l Typical cutsheet MPS configuration (powered on and processing work) - 3 phase approximate
31A total (6.448KVA)
l Typical continuous MPS configuration (powered on and processing work) - 3 phase approximate
36A total (7.448KVA)
Specifications
Pitney Bowes Epic v3.1 (ZVE0) Operator Guide May, 2018 Page 324 of 328

Table of Contents