EasyManua.ls Logo

Samsung 136S User Manual

Samsung 136S
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Confidential
English 8/2019. Rev 0.0
LIB System for UPS
Installation Manual
(136S)

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Samsung 136S and is the answer not in the manual?

Samsung 136S Specifications

General IconGeneral
BrandSamsung
Model136S
CategoryController
LanguageEnglish

Summary

About this Manual

Purpose of the Manual

Provides information for the safe and successful installation of the product.

Target Audience

Intended for system administrators and operators who install and configure the product.

Manual Organization

Outlines the document structure, product description, and installation steps.

Revision History

Details document revisions, including version, description, author, and date.

Acronyms and Abbreviations

Lists and defines acronyms and abbreviations used throughout the manual.

Product Description

Major Components Overview

Lists the main components of the product for installation reference.

Battery Module Types

Details Battery Module Type A and Type B, including polarity and model numbers.

SMU (String Management Unit)

Describes the SMU's function, components, and model variants for customers.

SMPS Assembly Types

Explains SMPS Assembly types with and without System BMS, detailing AC input options.

Rack Frame

Describes the rack frame's purpose for mounting components and providing ground connections.

Installing the Product

Grounding the Battery System

Provides safety warnings and details on grounding methods and wiring compliance.

Arc Flash Calculations

Presents arc flash related calculations based on system parameters and standards.

Installation Procedure Overview

Outlines the four main stages of installation: Preparation, Anchoring, Rack, and System.

Preparation Stage Procedures

Details steps for the preparation stage, including planning, unpacking, and inspection.

Preparation Stage: Unpacking

Lists required parts for unpacking and checks to be performed during the process.

Preparation Stage: Ground Wire and Tools

Specifies requirements for ground wires, fasteners, and rack anchoring components.

Preparation Stage: Recommended Tools

Lists recommended tools and instruments required for battery installation.

Preparation Stage: Visual Inspection

Guides visual inspection of rack frames, modules, SMU, and SMPS assemblies.

Rack Anchoring Stage

Details the process of anchoring rack frames, including safety precautions and clearance distances.

Rack Installation Stage

Covers the critical steps for installing components within the rack frame.

Front Door Removal

Provides instructions for safely removing the front door of the rack.

SMU and SMPS Assembly Installation

Details the procedure for inserting and attaching SMU and SMPS assemblies into the rack.

Battery Module Installation

Guides the installation of battery modules, emphasizing order and checking voltage/impedance.

Fuse-Busbar Assembly

Explains how to assemble fuse-busbar components before installing them into battery modules.

Busbar Installation

Covers connecting power busbars between modules and to the SMU, with safety notes.

Module and SMU Signal Cable Connection

Details the process of connecting signal cables between SMU and battery modules.

SMPS Assembly and SMU Power Cable Connection

Instructs on connecting DC power cables from SMPS Assembly to the SMU.

SMPS Assembly and SMU Signal Cable Connection

Explains signal cable connections for SMPS Assembly Type A to SMU.

SMPS Assembly AC Input Connection

Guides the connection of AC input power to the SMPS Assembly.

DC Link Cable Connection

Details connecting ground cables and DC link high-voltage terminals.

AC Input Commissioning

Covers powering SMPS Assembly AC inputs to turn on the BMS after installation.

BMS Configuration

Provides steps for configuring Rack BMS and System BMS using BATTMON software.

BATTMON Installation and Setup

Guides the installation and initial setup of the BATTMON software.

Rack BMS Configuration

Details setting Rack BMS CAN ID, module count, and configuration using BATTMON.

System BMS Configuration

Explains how to connect and configure the System BMS using BATTMON software.

Communication Check

Covers checking communication status by verifying IP settings and running MODBUS.

PC's IP Setting for Communication

Guides on setting the PC's IP address for communication with the System BMS.

System BMS Data Check

Details how to check System BMS data and monitor rack/cell information.

Reinstall the Front Door

Provides steps for reinstalling the front door to secure the rack.

Reinstall the Front Panel

Guides on reinstalling the front panel, securing it with screws and hooks.

Switching on the MCCB

Instructs on the final step of switching on the MCCB to connect the battery system.