3. Installing the Product Confidential
30 English 8/2019. Rev 0.0
(Side-to-Side
and Rear-to-
Rear)
not rated for seismic event
4 (All) ā Telcordia Zone 4
Workable distance
(800 recommended)
Workable distance
(800 recommended)
Workable distance
(1000 recommended)
Two anchor points (not rated for seismic event)
Four anchor points (Telcordia Zone 4)
Figure 3-2: Clearance Distance for Single Rack Frame
Two anchor points (not rated for seismic event)
Four anchor points (Telcordia Zone 4)
Figure 3-3: Clearance Distance for Multiple Rack Frames Installed Side-by-Side