Confidential 3. Installing the Product
English 8/2019. Rev 0.0 25
3.7 Preparation Stage—Recommended Tools/Instruments
Installers must provide these tools for installing the battery:
Table 3-7: Recommended Tools and Instruments
Power Screwdriver/Drill
(Max torque: 26Nm/270 kgf/cm)
To fasten SMU and SMPS assemblies to
the rack frames
(5.1–6.1Nm/50–60 kgf/cm)
For use with torque wrench
Phillips Screwdriver or Bit
To fasten SMU and SMPS assemblies to
the rack frames
(M5 Tip)
Moving rack frames and pallets
containing modules and SMU
Installing a high-current cable
(10~50 N.m / 100 ~ 500 kgf.cm)
Insulated Sockets
(13 mm, 17mm and 19mm)
Installing power cables and busbars
Insulated Extension for Socket