EasyManua.ls Logo

SatLab SLT2 - Applications Overview; Job Management Operations

SatLab SLT2
201 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Total Station Manual
-
56
-
5. Applications
Prepare setting before measuring:
Before starting the application, there are some preparations needed to set up.
The Pre-Settings screen will be shown after the user selects an application. User can
select and set the content of the Pre-Settings menu successively.
[*]: Setting has been done.
[ ]: Setting has not been done.
The details of every setting are as follows.
1. Setting the Job
The measured data and fix data are saved in the jobs which are shown as child
directories. The job contains different types of data, such as fix points, measured
points, station points, codes, etc. The data in the job can be read, edited and deleted.
1.1 Create a new Job
Key
Display
[F1]

Table of Contents