EasyManua.ls Logo

Siemens SIRIUS ACT 3SU1 - Configuring with the S7-PCT Stand Alone Port Configuration Tool; Application; Basic Procedure and Prerequisites

Siemens SIRIUS ACT 3SU1
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IO-Link 3SU14
12.1 Configuring the IO-Link
SIRIUS ACT 3SU1 pushbuttons and signaling devices
306 System Manual, 08/2018, A5E03457306020A/RS-AK/010
12.1.3
Configuring with the S7-PCT Stand Alone Port Configuration Tool
12.1.3.1
Application
Configuration is always done with the S7-PCT port configuration tool whenever no
SIMATIC CPU is available.
12.1.3.2
Basic procedure and prerequisites
Basic procedure when configuring IO-Link master and IO-Link devices with the S7-PCT Port
Configuration Tool (stand-alone)
1. You configure the connected IO-Link devices with the
S7-PCT
Port Configuration Tool.
Requirements
The
S7-PCT
Port Configuration Tool is installed on the PG/PC.
You can either install
S7-PCT
together with STEP 7 V5.4 SP5 or higher or STEP 7 TIA
Portal V12.0 or higher, or you can download it from the Internet
(http://support.automation.siemens.com/WW/view/en/37936752
).
IO-Link IODD files (IO Device Description) are installed in the
S7-PCT
hardware catalog.
All current IODD files of the SIRIUS devices are available on the Internet
(
https://support.industry.siemens.com/cs/#products?search=IODD&o=DefaultRankingDes
c&lc=en-WW).
IODD files for V1.0 and V1.1 are available for the combination of an IO-Link master and
an IO-Link device according to the IO-Link communication specification V1.1. You may
need IODD files according to the communication specification V1.0 when replacing
devices in existing installations.
Note
Configuring with S7
-PCT stand-alone is not possible for the CPU versions of the ET 200.

Table of Contents

Related product manuals