EasyManua.ls Logo

Solar-Log 2000 - Page 142

Solar-Log 2000
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
142
Smart Energy
Surplus offset [%]:
How much nominal plant output is to be fed into the grid and how much should be used for the Surplus
manage of the Smart Energy control logics can be defined in this box.
When output reduction is activated, a sensor has to be installed to determine the amount of theoretically
available production.
In the Surplus priority section, the list of defined switching groups and the detected intelligent appliances
are displayed according to their priority (the first entry in the list has the highest priority). This can be ad-
justed at anytime with the drag and drop function.
Note!
The prioritization occurs only for the surplus profiles and not, for example, for the run-
time control profiles.

Table of Contents

Other manuals for Solar-Log 2000

Related product manuals