17
S
If any parts are missing, contact the Shipping and Receiving Department to verify whether a shipping
box(es) was le behind. If all boxes were delivered and parts are unaccounted for, call and inform your
Project Manager of the missing items.
Use box cutters to open the shipping box along the seams.
Note Notice that the boxes have “break away” panels to allow easy access to the parts.
Verify that all parts are present and visibly undamaged.
4.3 Flat Panel Arms
e equipment will arrive in a shipping box on one pallet. e shipping box should contain the Flat
Panel Arm System and Ceiling Covers.
e Flat Panel Arm will be fully assembled and completely wired out of the crate. Uncrate pallet and
open the shipping box.
Use box cutters to open the shipping box along the seams.
Verify that all parts are present and visibly undamaged.
4.4 Booms
Each Boom will arrive in a shipping box on one pallet. e shipping box should contain a Boom Arm,
Service Head, shelves (if applicable), and Ceiling Covers.
Use box cutters to open the shipping box along the seams.
Verify that all parts are present and visibly undamaged.