EasyManua.ls Logo

Suzuki RM-Z250 - Bearing Removal and Installation

Suzuki RM-Z250
344 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10-10 TRANSMISSION AND CRANKSHAFT
BEARING REMOVAL AND INSTALLATION
Remove the oil seals. (!10-9)
Remove the bearing retainers.
REMOVAL
Remove the bearings (
1,
3,
5,
6,
7) with the special tool.
" 09913-70210: Bearing installer set
Bearing
1,
7: $ 35 Attachment
Bearing
3,
5,
6: $ 40 Attachment
Remove the bearings (
2,
8) with the special tool.
" 09921-20240: Bearing remover set
Bearing
2,
8: Remover 17 mm
CAUTION
The removed bearing should be discard.

Table of Contents

Other manuals for Suzuki RM-Z250

Related product manuals