EasyManua.ls Logo

Suzuki RM-Z250 - Electrical Circuit Inspection Procedure

Suzuki RM-Z250
344 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12-6 FUEL SYSTEM
DISASSEMBLY
Remove the hot starter valve
1 and spring from the hot
starter cable.
Remove the drain hose and air vent hoses.
NOTE:
Do not remove the throttle position sensor
2 unless it is neces-
sary to replace it.
Remove the starter valve
3.
Remove the top cap
4 and gasket.
Remove the throttle valve assembly
5.

Table of Contents

Other manuals for Suzuki RM-Z250

Related product manuals