EasyManua.ls Logo

Suzuki RM-Z250 - Installation

Suzuki RM-Z250
344 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FRONT FORK AND STEERING 17-17
INSTALLATION
Install the front fork with the line
T aligned with the upper sur-
face of the upper bracket.
Check that the air valve
A is positioned at the front.
Tighten the fork lower clamp bolts to the specified torque.
& Fork lower clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
Tighten the fork cap bolt (sub-tank) to the specified torque.
" 09941-53630 : Front fork top cap wrench
& Fork cap bolt: 35 N·m (3.5 kgf-m, 25.5 lb-ft)
Tighten the fork upper clamp bolts to the specified torque.
& Fork upper clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
NOTE:
Check that the air valve is positioned at the front.
Install the handlebars. (!17-23)
Install the front wheel. (!15-6)
Install the brake caliper. (!16-9)
Install the fork protector.
INSPECTION AFTER INSTALLATION
Front fork (!2-33)
Steering (!2-34)
Wiring harness, cable and hose routing (!19-18 to -23)

Table of Contents

Other manuals for Suzuki RM-Z250

Related product manuals