EasyManua.ls Logo

Suzuki RM-Z250 - Page 182

Suzuki RM-Z250
344 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LUBRICATION SYSTEM 11-7
Install the oil pump No.2 outer rotor
8.
Apply engine oil to the outer rotor and inner rotor.
Install the oil pump and tighten the oil pump mounting bolts to
the specified torque.
% Oil pump mounting bolt: 6 N·m (0.6 kgf-m, 4.5 lb-ft)
Install the oil pump idle gear
9, washer and snap ring.
" 09900-06107: Snap ring pliers
Install the primary drive gear. (!10-17)
Install the magneto cover. (! 14-14)
Install the clutch assembly. (!7-8, -9)
Install the right crankcase cover and kick starter lever.
(!8-5 to -8)
Install the brake pedal. (!16-18)
INSPECTION AFTER INSTALLATION
Engine oil level and oil leakage (!2-11)
Engine coolant level and coolant leakage (!2-15, -16)
Oil pressure (! 2-37)
CAUTION
Face the punch mark
E on outer rotor
8 to the crank-
case.
CAUTION
Replace the snap ring with a new one.

Table of Contents

Other manuals for Suzuki RM-Z250

Related product manuals