EasyManua.ls Logo

Suzuki RM-Z250 - Page 198

Suzuki RM-Z250
344 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FUEL SYSTEM 12-15
Reassemble the hot start valve
E to the hot start cable end.
ACCELERATION PUMP TIMING
If turn the stop screw of the acceleration pump, adjust the accel-
eration pump timing after assemble the carburetor.
Select a pin
B of the same diameter as the throttle valve
height
A and insert it under the throttle valve.
% Throttle valve height: 4.4 mm (0.173 in)
Turn in the stop screw
C fully.
Check play of the link lever
D.
Turn the stop screw
C counterclockwise gradually until no
free play is available on the link lever
D.
CAUTION
Replace the gasket with a new one.

Table of Contents

Other manuals for Suzuki RM-Z250

Related product manuals