EasyManua.ls Logo

Suzuki RM-Z250 - Page 210

Suzuki RM-Z250
344 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
COOLING SYSTEM 13-9
Fit the right crankcase cover.
Tighten the right crankcase cover bolts to the specified torque.
! Right crankcase cover bolt: 11 N·m (1.1 kgf-m, 8.0 lb-ft)
Install the brake pedal. ("16-18)
Install the kick starter lever. ("8-7)
WATER PUMP CASE
Install the dowel pins and oil filter
1.
Apply engine coolant to the gasket
2.
Install the gasket
2 and
spring
3.
Fit the water pump case.
Tighten the water pump case bolts and drain bolt to the speci-
fied torque.
! Water pump case bolt: 11 N·m (1.1 kgf-m, 8.0 lb-ft)
Engine coolant drain bolt: 6 N·m (0.6 kgf-m, 4.5 lb-ft)
Connect the radiator hose and pour engine coolant.
("19-23)
INSPECTION AFTER INSTALLATION
Engine oil level and leakage ("2-11)
Engine coolant level and leakage ("2-15, -16)
CAUTION
Use a new gasket to prevent engine oil/coolant leak-
age.
CAUTION
Use new gasket washer
A to prevent engine coolant
leakage.

Table of Contents

Other manuals for Suzuki RM-Z250

Related product manuals