Chapter 4
41
UM10372_PCNC440_Manual_0221A
OPERATiON
4.5.2 Change TTS Tool Holder
1. Loosen the drawbar by one turn with a 13 mm wrench.
2. Grasp the tool holder in one hand and use a mallet to gently strike the top of the drawbar.
3. Remove the tool holder.
4. Using one hand, insert the TTS collet into the boom of the spindle.
5. Twist the collet while applying light upward pressure unl the collet groove aligns with the
spindle alignment pin; the collet is pushed completely inside the spindle taper.
6. Using your other hand, insert the drawbar into the drawbar bushing installed in Step 6; rotate
the drawbar to engage several threads in the TTS collet.
7. Place and hold a TTS tool holder inside the TTS collet and against the spindle nose. Using a
13 mm wrench, rotate the drawbar and ghten the collet against the TTS tool holder.
4.5.3 Tips on Using TTS
• Never ghten the TTS collet without a tool holder inserted
• Never change tools while a tool holder is in the spindle as this may damage the spindle
alignment pin
• To minimize tool pull-out, periodically wipe tool holder shanks clean and dry with a degreasing
agent
• When not in use, apply a protecve spray (WD-40
®
or similar) to prevent surface rust on bare
metal surfaces of tool holders
• The drawbar, drawbar bushing, and TTS collet are wear items. Inspect threads and mang
surfaces regularly and replace if damage or wear is apparent as it reduces the ability to ghten
tools properly
R8 collets and R8 taper tool holders are also compable. These are installed in a similar manner to
the TTS collet as described above, but must be removed completely during each tool change.
NOTE: The PCNC 440 ships with a drawbar with 7/16”-20 UNF thread.