TestingtheHighTemperatureWarningSwitch(continued)
8.Afteryoucompletethetesting,installthetemperatureswitchtotheengine
housing,dothefollowingsteps:
A.Cleanthethreadsofthehousingandswitch.Applythreadsealantto
thethreadsoftheswitch.
B.Threadtheswitchintothehousing;torquetheswitchto29.4to39.2
N∙m(22to28ft-lb).
C.Connecttheharnesswirestothetemperatureswitch.
9.Filltheenginecoolingsystem;refertotheTractionUnitOperator’sManual.
10.Lowerthehoodandsecureitwiththelatches.
ElectricalSystem:TestingtheElectricalComponents
Page6–54
Groundsmaster
®
3280-D/3320
05138SLRevB