3.5 Preparing Site
3.5.1 Laying Foundations
Incorrectly installed foundation presents a safety hazard. To ensure safety,
follow these instructions, as well as local and state legislation and regulations during
installation.
WARNING!
For detailed instructions on how to lay concrete foundations for the mast, ceilometer, and
precipitation gauge, see the following documents:
Vaisala Guyed Frangible Mast DKE110F User Guide
Vaisala Composite Pole Mast DKE110W and DKE110AV User Guide
Vaisala DKE200 Series Frangible Lattice Mast EXEL 11 Installation Manual
Vaisala Short Pole Mast DKP202, DKP203, DKP204, and DKP204W-CAMPOLE User
Guide
Vaisala Tiltable Pole Mast DKP206 and DKP210 User Guide
Vaisala Ceilometer CL31 User Guide
OTT Pluvio
2
L Precipitation Gauge Operating Instructions
3.5.2
 Designing Concrete Foundation for Rain Gauges
The concrete foundation must be prepared before mounting the equipment. For more
detailed instructions, see the rain gauge documentation. For foundation and measurement
instructions, see the following drawings.
Note the following:
Decide dimension H.
Build the surroundings and the level of foundations in accordance with local and state
legislation and regulations.
Take into account the recommendations in ICAO Annex 14.
All the dimensions in the rain gauge foundation
figures are in millimeters.
AWS310/AWS310-SITE Installation Manual M211584EN-F
26

Table of Contents

Other manuals for Vaisala AWS310

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vaisala AWS310 and is the answer not in the manual?

Vaisala AWS310 Specifications

General IconGeneral
BrandVaisala
ModelAWS310
CategoryWeather Station
LanguageEnglish

Related product manuals