EasyManua.ls Logo

Vanderbilt SPC42 Series - Compliance with NF and A2 P Approvals

Vanderbilt SPC42 Series
368 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Directives and standards
3
EU directives
29
Vanderbilt
Installation & Configuration Manual
A6V10276959
01.05.2016
Hardware Fault reporting in Options, you must select the Enabled +
Reporting (10s) option from the Watchdog Output Mode drop-down list.
Note: Hardware faults are not reported if the Engineer is logged in to the
system.
Hardware
VDS compliance requires the following:
A G5 housing with Front tamper implemented as a minimum requirement.
Keypads do not show status information if the system is armed.
The number of supported zones is as follows:
512 zones in ring configuration
128 zones per X-Bus in multi-drop (spur) configuration
The following end of line resistance combinations do not comply with VdS
standards:
1k, 470 ohm
1k, 1k, 6k6 ohm
3.1.7 Compliance with NF and A2P approvals
Address of Certifying Body
CNPP Cert
Pôle Européen de Sécurité - Vernon
Route de la Chapelle Réanville
CD 64 - CS 22265
F-27950 SAINT MARCEL
www.cnpp.com
AFNOR Certification
11 rue François de Pressensé
93571 Saint Denis La Plaine Cedex
www.marque-nf.com
To comply with NF & A2P installation regulations, this enclosure must be sealed
by affixing the accompanying Tamper Label after installation.

Table of Contents

Related product manuals