EasyManua.ls Logo

WSTECH APS Series - Seismic IEEE 693 Option Details

WSTECH APS Series
213 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Original Operating Instructions
APS Series Outdoor Hybrid Inverter
Description
APS-Series 120 Operating Instructions v320 EN
Page 33 of 213
2.4.1 Option Seismic IEEE 693
NOTICE: Mounting of a cooling tower differs to the standard procedure (Section 4.4).
The figures show the stiffening strives and their mounting points in the different
Sections.
Figure 8: Interior view front Seismic
with protective cover
Figure 9: Interior view back Seismic
with protective cover
Figure 10: Interior
view control unit
Seismic
Pos.
Description
1
Mounting point
2
Stiffening strive
Figure 11: Detail view stiffening strive
Figure 12: Detail view mounting point
Pos.
Description
1
Turnbuckle
2
Screw connection of stiffening strive attachment point

Table of Contents