EasyManua.ls Logo

WSTECH APS Series - Connecting Cooling Tower

WSTECH APS Series
213 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Original Operating Instructions
APS Series Outdoor Hybrid Inverter
Installation
APS-Series 120 Operating Instructions v320 EN
Page 86 of 213
4.4.3 Connecting Cooling Tower
Required material (not included in scope of delivery):
50mm Open-jaw spanner
Procedure:
1. Check positioning of the sealing rings.
NOTICE: The sealing ring is on the cone on both sides of the fluid hoses.
2. Connect cooling fluid hoses (Figure 72).
3. Tighten cap nut with 20 Nm.
4. Connect coded plug connectors (Figure 73).
Figure 72: Connection of cooling tower
Pos.
Description
1
Cooling fluid hose short
2
Cooling fluid hose long
3
Coded plug connector

Table of Contents