4.4.3 Connecting Cooling Tower
Required material (not included in scope of delivery):
• 50mm Open-jaw spanner
Procedure:
1. Check positioning of the sealing rings.
NOTICE: The sealing ring is on the cone on both sides of the fluid hoses.
2. Connect cooling fluid hoses (Figure 72).
3. Tighten cap nut with 20 Nm.
4. Connect coded plug connectors (Figure 73).
Figure 72: Connection of cooling tower