Controls, Connections, and Setup Procedures
DOCUMENT CONTROL NOTE:
The controlled version of this document resides on MedNet. Any printed copy of this document is uncontrolled.
2.1 Checking the Installation Site Prerequisites
(1) Confirm that all prerequisites described in the "Installation readiness checklist"
are fulfilled.
This checklist is available at the end of CR 30-X Service Documentation
Chapter 11, Installation Planning.
2.2 Preparing the required Tools
Following tools are required during the installation procedure:
REQUIRED TOOLS:
3 mm
cutte
USB Stick
(checked to be virus free)
*The last digit in the spare part number indicates the spare part revision at release of this document.
When ordering, the actual revision of the spare part is delivered.