EasyManua.ls Logo

AGFA CR 30-X - Inspection and Unpacking; Checking the Packing for Obvious Damage

AGFA CR 30-X
443 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DD+DIS150
.06E
Controls, Connections, and Setup Procedures
DOCUMENT CONTROL NOTE:
The controlled version of this document resides on MedNet. Any printed copy of this document is uncontrolled.
3 Inspection and Unpacking
Task Required
Time
Importance Task Code* Section
Check the packing for
obvious damage.
1 minute mandatory INS 3.1
Unpack digitizer (if not yet
done).
10 minutes mandatory INS 3.3
Check shipment
completeness.
5 minutes mandatory INS 3.3
*Complete required time per Task Code to be entered in the Agfa repair report.
3.1 Checking the Packing for obvious Damage
(1) Check the packing material for visible transport damage such as:
Dented edges
Damage on the box
Torn fixing elements (metal straps)
(2) Check the attached safety indicators on the packing boxes.
IMPORTANT:
If the machine was tilted, the circle in the arrow
head of the TILTWATCH changes from white to
red.
If the machine was subjected to shocks, the
square field in the middle of the SHOCKWATCH
changes from white to red.
If damage is visible from the outside contact your
local AGFA representative.
White field is OK.
Red field is not OK.
STOSSEMPFINDLICH
Edition 1, Revision 5 CR 30-X Chapter 1 / 6
11-2009 Type 5175 / 100/110 Agfa Company Confidential

Table of Contents

Other manuals for AGFA CR 30-X

Related product manuals