EasyManua.ls Logo

CENNTRO LOGISTAR 100 - Page 34

Default Icon
468 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Vehicle body
20
Installation
Schematic diagram
Steps
1. Install the front crossbeam assembly.
2. Install 4 fasteners of the front
crossbeam assembly.
Tightening torque: 65 N·m (6.5 kg·m, 47.0
ft-lbs)
3. Remove the jack.
4. Install the stabilizer bar.
5. Install 2 fasteners of the stabilizer bar
(A).
Tightening torque: 65N·m (6.5kg·m,
47.0ft-lbs)
6. Install the left and right thrust rods.
7. Install 8 fasteners of the left and right
thrust rods.
Tightening torque: 43N·m (4.3kg·m,
31.5ft-lbs)

Table of Contents