EasyManuals Logo

GE LOGIQ Totus User Manual

GE LOGIQ Totus
644 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #100 background imageLoading...
Page #100 background image
GE HealthCare CONFIDENTIAL
Direction 5936427, Rev. 1 LOGIQ Totus Basic Service Manual
3 - 18 Section 3-5 - Completing the Setup
3-5-7 Power on/boot up
Warnings
NOTE: Do not cycle the circuit breaker ON-OFF-ON in less than five seconds. When turning OFF the
circuit breaker, WAIT until the ON/OFF button is no longer lit. The LOGIQ Totus should de-
energize completely before turning the circuit breaker ON.
DANGER
ALWAYS CONNECT THE ULTRASOUND SYSTEM TO A FIXED POWER SOCKET
WHICH HAS THE PROTECTIVE GROUNDING CONNECTOR. FAILURE TO
FOLLOW THESE INSTRUCTION COULD LEAD TO ELECTRICAL SHOCK.
DANGER
NEVER USE A THREE-TO-TWO PRONG ADAPTER; THIS DEFEATS THE
SAFETY GROUND. FAILURE TO FOLLOW THESE INSTRUCTION COULD LEAD
TO ELECTRICAL SHOCK.
DANGER
ENSURE THAT THE POWER CORD AND PLUG ARE INTACT AND THAT THE
POWER PLUG IS THE PROPER HOSPITAL-GRADE TYPE (WHERE REQUIRED).
FAILURE TO FOLLOW THESE INSTRUCTION COULD LEAD TO ELECTRICAL
SHOCK.
CAUTION
LOGIQ TOTUS REQUIRES ALL COVERS.
ONLY OPERATE THE LOGIQ TOTUS WHEN ALL OF THE BOARD COVERS AND FRAME
PANELS ARE SECURELY IN PLACE. THE COVERS ARE REQUIRED FOR SAFE OPERATION,
GOOD PERFORMANCE AND COOLING PURPOSES.
CAUTION
USE ONLY POWER SUPPLY CORDS, CABLES, AND PLUGS PROVIDED BY OR DESIGNATED
BY GE HEALTHCARE.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ Totus and is the answer not in the manual?

GE LOGIQ Totus Specifications

General IconGeneral
BrandGE
ModelLOGIQ Totus
CategoryMedical Equipment
LanguageEnglish

Related product manuals