EasyManuals Logo

GE LOGIQ Totus User Manual

GE LOGIQ Totus
644 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #57 background imageLoading...
Page #57 background image
GE HealthCare CONFIDENTIAL
Direction 5936427, Rev. 1 LOGIQ Totus Basic Service Manual
Chapter 1 Introduction 1 - 25
1-7-2 Lockout/tagout procedure
1-7-2-1 Power down the LOGIQ Totus
Apply lockout and tagout (LOTO) before servicing the Ultrasound system. Applying LOTO ensures a
safe environment when working on the LOGIQ Totus. Follow all recommended safety procedures when
servicing and working near energy sources. Follow LOTO requirements by ensuring you are in total
control of the AC power plug at all times during the service process.
Table 1-8 Power Down the LOGIQ Totus
Step Corresponding Graphic
1.
Set the caster brake.
Use the operator panel movement controls to set the panel height as required for this procedure.
Lock the panel in place.
2.
To completely power down the LOGIQ Totus:
Lightly press the ON/OFF button on the operator
panel to display the System - Exit menu.
3.
Select Shutdown to completely power down the
LOGIQ Totus.
4.
Wait for the ON/OFF button to turn from blue to white.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ Totus and is the answer not in the manual?

GE LOGIQ Totus Specifications

General IconGeneral
BrandGE
ModelLOGIQ Totus
CategoryMedical Equipment
LanguageEnglish

Related product manuals