GE HealthCare CONFIDENTIAL
Direction 5936427, Rev. 1 LOGIQ Totus Basic Service Manual
4 - 6 Section 4-2 - General Procedures
VSIO (ECG)
Leakage Current measured at (record the value) and meets
allowable limits. Equipment passed all required checks and is
ready for use.
4-3-22
ECG Checks
Active ECG:
Utility > Applications > Settings > ECG >
Show ECG Tools.
Connect cables. Press Display ECG Tab on
TP. Verify ECG signal displayed on monitor.
Plug in the ECG cables with nothing attached
so they pick up noise.
Diagnostics
Battery Pack/
4-3-25
Battery Pack functional checks
VNAV
4-3-24
Volume Navigation with inside probe functional
checks
Table 4-2 General System Functional Checks (Continued)
Section Functional Check Debrief Script