GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
8 - 28 Section 8-4 - Loading / Reloading / Upgrading the Software
8-4-8 Loading the base image and application software - System only (continued)
Verifying the software versions:
1.) From the touch panel, select Utility > System > About.
2.) Verify software version matches the version in the software used during installation, version
received with kit.
Verifying the TCP/IP settings:
1.) From the touch panel, select Utility > Connectivity > SUMMARY > TCP/IP.
2.) Verify TCP/IP settings.
3.) If you modified or updated any settings, select Save settings.
4.) Select OK to continue.
5.) Reboot the system.
Verifying the AE title and port settings:
1.) From the touch panel, select Utility > Connectivity > SUMMARY > Scanner.
2.) Verify device settings.
3.) If you modified or updated any settings, Go to Summary and select Apply Changes & Exit.
Check patient archive
Confirm that the patient archive is available. If the patient archive is encrypted, you will need the
encryption key or password to unlock.
Check system configurations
Check the printer selection and reselect the standard printer color and/or B&W if needed. Reloading
software may reset the printer selection even after restoring user configurations.
Check that the online help language is set.
Check for any field that appears highlighted in yellow as this is an indication that the field needs to be
reset.
Confirm that at least the system drive encryption has been initialized. Contact the site administrator for
them to set up the user partitions encryption.
Functional checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
Table 8-10 Loading System Partition Only Software Functional Checks
: Section Functional Check Debrief Script
4-2-3 Power ON/Boot Up
Equipment passed all required checks and is ready for
use.
4-3-7 Probe/connector functional checks
4-3-8 B-Mode functional checks
4-3-10 System CFM and PWD functional checks
4-3-20 Basic measurement functional checks
4-2-4 Power shut down