EasyManuals Logo

GE LOGIQ Totus User Manual

GE LOGIQ Totus
644 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #549 background imageLoading...
Page #549 background image
GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline) 8 - 223
Section 8-12
Functional Checks after FRU replacement (Debrief Guideline)
8-12-1 Purpose of this section.
This section describes how to perform functional Checks after FRU replacement (Debrief Guideline)
8-12-2 Replacement of the Unity Base Tray
N/A
8-12-3 Replacement of the Front Cover Assy-T
N/A
8-12-4 Replacement of the Front Dummy Cover Set-T
N/A
8-12-5 Replacement of the Unity Protector Assy
8-12-6 Replacement of the Front Cover Bottom Assy-T
N/A
8-12-7 Replacement of the T2 Side Cover L Assy
N/A
8-12-8 Replacement of the T2 Side Cover R Assy
N/A
8-12-9 Replacement of the Side Dummy Cover Set-T
N/A
8-12-10 Replacement of the Rear Cover Mid Assy-T
N/A
8-12-11 Replacement of the Air Filter Set-U
N/A
8-12-12 Replacement of the Base Cover Set-T
N/A
Functional Check Debrief Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-20 "Basic measurement functional checks"
4-2-4 "Power shut down"

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ Totus and is the answer not in the manual?

GE LOGIQ Totus Specifications

General IconGeneral
BrandGE
ModelLOGIQ Totus
CategoryMedical Equipment
LanguageEnglish

Related product manuals