GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
8 - 226 Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline)
8-12-34 Replacement of the T2 Gel Warmer
1.) Insert gel bottle into Gel Warmer
2.) Power ON the warmer
3.) Check if the gel gets warm
8-12-35 Replacement of the Gel Warmer Cap
1.) Insert gel bottle into Gel Warmer
2.) Power ON the warmer
3.) Check if the gel gets warm
8-12-36 Replacement of the OPIO Swivel Up/Down Button Set-T
8-12-37 Replacement of the UOPIO-T Assy
8-12-38 Replacement of the Trackball assy-U_FLT20UFA-GJ
8-12-39 Replacement of the T2 OPIO Cable Hook
N/A
8-12-40 Replacement of the Speaker Grill Set-T
N/A
Functional Check Debrief Script
4-3-1 "Control panel adjustment and functional
checks"
Equipment passed all required checks and is ready for
use.
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-20 "Basic measurement functional checks"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-20 "Basic measurement functional checks"
4-2-4 "Power shut down"