EasyManua.ls Logo

GE LOGIQ Totus

GE LOGIQ Totus
644 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline) 8 - 237
8-12-78 Replacement of the UVSC-T
8-12-79 Replacement of the UBC-T
8-12-80 Replacement of the 4S2P Battery Pack (14.4V Li-ion 5900 mAh Rechargeable)
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-7 "Probe/connector functional checks"
10-6-6 "Earth Leakage Current Test"
Attach the customer’s Internal Universal Video Converter
device to the rear I/O. Confirm content displayed on the
monitor mirrors content displayed on the main monitor of
the system. Confirm that the customer’s Internal Universal
Video Converter device can record content displayed on
the main monitor of the system.
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-7 "Probe/connector functional checks"
4-3-25 "Battery Pack functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-7 "Probe/connector functional checks"
4-3-25 "Battery Pack functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"

Table of Contents

Related product manuals