EasyManuals Logo

GE LOGIQ Totus User Manual

GE LOGIQ Totus
644 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #7 background imageLoading...
Page #7 background image
GE HealthCare CONFIDENTIAL
Direction 5936427, Rev. 1 LOGIQ Totus Basic Service Manual
v
DAMAGE IN TRANSPORTATION
All packages should be closely examined at time of delivery. If damage is apparent write “Damage In
Shipment” on ALL copies of the freight or express bill BEFORE delivery is accepted or “signed for” by
a GE HealthCare representative or hospital receiving agent. Whether noted or concealed, damage
MUST be reported to the carrier immediately upon discovery, or in any event, within 14 days after
receipt, and the contents and containers held for inspection by the carrier. A transportation company will
not pay a claim for damage if an inspection is not requested within this 14 day period.
CERTIFIED ELECTRICAL CONTRACTOR STATEMENT - FOR USA ONLY
All electrical Installations that are preliminary to positioning of the equipment at the site prepared for the
equipment shall be performed by licensed electrical contractors. Other connections between pieces of
electrical equipment, calibrations and testing shall be performed by qualified GE personnel. In
performing all electrical work on these products, GE HealthCare will use its own specially trained field
engineers. All of GE HealthCare’s electrical work on these products will comply with the requirements
of the applicable electrical codes.
The purchaser of GE HealthCare equipment shall only utilize qualified personnel (i.e., GE HealthCare’s
field engineers, personnel of third-party service companies with equivalent training, or licensed
electricians) to perform electrical servicing on the equipment.
OMISSIONS & ERRORS
If there are any omissions, errors or suggestions for improving this documentation, please contact the
GE Global Ultrasound Documentation Group with specific information listing the system type, manual
title, part number, revision number, page number and suggestion details.
Mail the information to:
Service Documentation
9900 Innovation Drive (RP-2156)
Wauwatosa, WI 53226, USA.
GE employees should use Post-market Quality Management (PQM) to report service documentation
issues. These issues will then be in the internal problem reporting tool and communicated to the writer.
SERVICE SAFETY CONSIDERATIONS
For a complete review of all safety requirements, the Chapter 1, Safety Considerations section in the
Service Manual.
DANGER
DANGEROUS VOLTAGES, CAPABLE OF CAUSING DEATH, ARE PRESENT IN
THIS EQUIPMENT. USE EXTREME CAUTION WHEN HANDLING, TESTING AND
ADJUSTING.
WARNINGWARNING
Use all Personal Protection Equipment (PPE) such as gloves, safety shoes, safety
glasses, and kneeling pad, to reduce the risk of injury.
NOTICE
Several hand pictures do not have cut resistant gloves on in the service manuals but
the purpose of the picture is to address the location of the parts and process steps.
Therefore, field engineers should wear cut resistant gloves to reduce the risk of injury.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ Totus and is the answer not in the manual?

GE LOGIQ Totus Specifications

General IconGeneral
BrandGE
ModelLOGIQ Totus
CategoryMedical Equipment
LanguageEnglish

Related product manuals